Draw a run on the Build tab. Cut lengths and the bill of material appear here as you go.
Developed by Bryan Leurquin
Butt-weld end prep (open root)
Bevel angle37.5° ± 2.5° (75° included)
Root face (land)1/16" (1.6 mm) nominal
Root opening (gap)1/16" – 3/32"
The 37.5° bevel is measured from the plane square to the pipe axis, so two prepped ends form a 75° included V. The land is the flat at the root that the root pass fuses through; too little burns back, too much leaves lack of penetration.
Fit-up & weld sequence
Bevel both ends to 37.5° and dress a clean 1/16" land. Wire-brush bevel and 1" back to bright metal.
Set the root gap with a spacer or rod tip (match it to your selected gap), align with line-up clamp; check hi-lo.
Tack 3–4 places, feather (grind) the start/stop of every tack.
Run the root pass; keep the keyhole consistent. Grind any suck-back before the hot pass.
Hot pass to burn out root defects, then fill passes, then a slightly wider cap with even tie-in.
Inter-pass clean (chip/brush) between every pass; control inter-pass temp on alloy/SS.
General guidance only. Actual bevel, land, gap, filler and pass sequence are governed by the qualified WPS for the material, wall thickness and process on your job.